Key points
- Dubai Design Week and Downtown Design take place in Dubai Design District (d3).
- Downtown Design is the trade fair; Design Week adds installations, talks and exhibitions across the district.
- Visitors are designers, architects, developers and design-conscious buyers.
- Installations and 3D printed feature pieces show what a brand or designer can do.
A show for designers
At most trade shows the product is the focus. At Downtown Design and Design Week, visitors look at everything: proportions, materials, lighting and detail. A stand built from standard system panels says the wrong thing about a design brand.
Stands at Downtown Design
- Room settings that show furniture and lighting as they would be used
- Controlled, warm lighting rather than hall lighting
- Real materials at full size, with samples to take away
- A quiet corner for project conversations with designers and developers

Installations for Design Week
Design Week installations are temporary pieces of architecture: pavilions, sculptures, light pieces and interactive objects. 3D printing is well suited to them, because it makes complex, parametric forms possible in a short time. We print and finish installation parts, from small modules repeated hundreds of times to large sculptural pieces. See 3D printed interior elements and large format 3D printing.
Prototypes and new products
Many brands use the fair to launch new pieces. A 3D printed prototype or presentation model lets you show a product before production starts. See rapid prototyping.
Lead times
- Custom stand: 8 to 10 weeks
- Installation pieces: 4 to 8 weeks depending on size and repetition
- Prototypes and presentation models: 1 to 3 weeks
For the stand, see exhibition stand design.
See all our exhibitor guides for Dubai, Abu Dhabi, Sharjah and Riyadh.
Frequently asked questions
Where are Dubai Design Week and Downtown Design held?
In Dubai Design District (d3). Check the official websites for the dates.
Can you 3D print an installation for Design Week?
Yes. We print and finish installation parts, from repeated modules to large sculptural pieces, and can assemble them on site.
Can you make a prototype of a new product for the fair?
Yes. Presentation prototypes are printed and finished to look like the final product.
How early should we start an installation?
Six to ten weeks before the event, depending on size and complexity.
Plan your stand or installation
Send us your concept, sketches or 3D files and the space you have. We will reply with a production approach and a quote.
ALCA Models is not connected to the show organiser. Always follow the official exhibitor manual for your edition: venues, halls, build-up times and technical rules can change from year to year.